top of page
FEATURED AIRPORT & STADIUM PROJECTS

Delta Skyway Phase 1

400,000 square-foot, new construction of the Delta Central Headhouse between Terminals 2 & 3 and new construction of the Terminal 3 Concourse. The exterior closure is glass with metal panels and plaster.

Owner

LAWA

Architect

Gensler/ARUP

Location

LAX Terminal 3

General Contractor

Hensel Phelps

Square Footage

40,000,000

NGi Scope

  • Design Build/Assist

  • Metal Stud Framing

  • Drywall

  • Fireproofing

  • Lath & Plaster

  • EIFS/Exterior Cladding

Delta Skyway

SoFi Stadium

The Inglewood Stadium is a new 2.7 million SF multipurpose facility located in Inglewood CA with seating capacity of 70,000 and standing room for 27,000 more. NGi scope included; exterior plaster on (levels 1-8) including outside concession/restroom pods located inside the structure. Interior framing, drywall & veneer plaster on levels 6,7,8. Manpower Peaked at 150 employees including roughly 7 various subs.

Owner

Hollywood Park Land Co.

Architect

HKS

Location

Inglewood, CA

General Contractor

Turner/Hunt JV

Square Footage

2,700,000

NGi Scope

  • BIM

  • Metal Framing & Drywall​​

All suites & concessions levels 6-8​

  • Fireproofing

  • Lath & Plaster

60,000 total yards​

Themocromex Lime Finish

  • Load bearing structures

SoFi Stadium

SFO Control Tower & Terminal 1

Design-Build project rebuild of the existing terminal. The new 860,000 square-foot terminal includes four levels, a large utility corridor, a state of the art baggage handling system, airline support space, concessions spaces, enhanced security & safety measures, and seamless integration with the existing roadway and adjacent infrastructure to ensure an enjoyable experience for the traveling public. Construction of the new facility was heavily phased in order to keep portions of the airport operations and passenger movement uninterrupted. 

Owner

SFIA

Architect

Gensler

Location

San Fransisco, CA

General Contractor

Hensel Phelps 

Square Footage

860,000

NGi Scope

  • Design Build / Design Assist

  • Preconstruction Consulting

  • Metal Framing

  • Lath & Plaster

  • Acoustical / Specialty Ceilings

SFO Control Tower

Southwest Airlines LAX Terminal 1.5

New passenger building located at LAX. The T1.5 project is housed in a new four-story building with a utility basement, approximately 250,000 sf.

Owner

LAWA

Architect

HKS

Location

LAX Terminal 1.5

General Contractor

Hensel Phelps

Square Footage

250,000

NGi Scope

  • Preconstruction Consulting

  • Spray Applied Fireproofing

  • Acoustical / Specialty Ceilings

Southwest LAX Terminal 1.5
bottom of page